You don't have javascript enabled. Good luck with that.
Pencarian
Pengurasan Gorong-gorong Saluran Penghubung Kelapa Kopyor Rampung
....
photo Budhi Firmansyah Surapati - Beritajakarta.id

Box Culverts Dredging Work on Jalan Kelapa Kopyor Finally Completed

The North Jakarta Water Resources (SDA) has finally completed dredging of the Kelapa Kopyor connecting channel's box culverts from mud in Kelapa Gading Timur, Kelapa Gading.

We want to smoothen water flow in the culverts from Jalan Boulevard Raya

Kelap Gading Sub-district SDA Executing Unit Head Citrin Indriyanti said, it was carried out to maximize the function of the culverts.

"We want to smoothen water flow in the culverts from Jalan Boulevard Raya," she said, Sunday (12/27).

Joint Personnel Get Down and Dirty on Mass Cleanup along Jalan Raya Bogor

She explained, each culvert has about 20 meters long by 2.5 meters wide.

Similar action was also spotted on two other culverts along Jalan Kelapa Kopyor. They had 20 meters long with 2.2 meters wide and 12.5 meters long with 2.3 meters wide.

"Alhamdulillah the work is also completed already," he stated.

Linked News
Popular News indeks
  1. Rano: Pancasila is the Big House for Indonesia's Diversity

    access_time02-06-2025 remove_red_eye526 personBudhi Firmansyah Surapati
  2. Friendly Countries' Ambassadors Participate in Famtrip to Seribu Islands

    access_time05-06-2025 remove_red_eye417 personAldi Geri Lumban Tobing
  3. Transjabodetabek Bogor–Blok M Route and Corridor 13 Extension Begin Operations

    access_time05-06-2025 remove_red_eye401 personDessy Suciati
  4. S. Jakarta Mayor: Idul Adha is a Moment to Enhance Compassion Among One Another

    access_time06-06-2025 remove_red_eye288 personTiyo Surya Sakti
  5. No Odd-Even Restrictions in Jakarta on June 6-9, 2025

    access_time03-06-2025 remove_red_eye274 personAldi Geri Lumban Tobing

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik