You don't have javascript enabled. Good luck with that.
Pencarian
Pengurasan Gorong-gorong Saluran Penghubung Kelapa Kopyor Rampung

Box Culverts Dredging Work on Jalan Kelapa Kopyor Finally Completed

The North Jakarta Water Resources (SDA) has finally completed dredging of the Kelapa Kopyor connecting channel's box culverts from mud in Kelapa Gading Timur, Kelapa Gading.

We want to smoothen water flow in the culverts from Jalan Boulevard Raya

Kelap Gading Sub-district SDA Executing Unit Head Citrin Indriyanti said, it was carried out to maximize the function of the culverts.

"We want to smoothen water flow in the culverts from Jalan Boulevard Raya," she said, Sunday (12/27).

Joint Personnel Get Down and Dirty on Mass Cleanup along Jalan Raya Bogor

She explained, each culvert has about 20 meters long by 2.5 meters wide.

Similar action was also spotted on two other culverts along Jalan Kelapa Kopyor. They had 20 meters long with 2.2 meters wide and 12.5 meters long with 2.3 meters wide.

"Alhamdulillah the work is also completed already," he stated.

Linked News
Popular News indeks
  1. Jakarta Removes Gibran’s Portraits Across All Government Offices

    access_time16-11-2026 remove_red_eye1193 personFakhrizal Fakhri
  2. Transjakarta Offers Free Rides for Jakarta Vertical Run 2026 Participants

    access_time14-11-2026 remove_red_eye736 personAldi Geri Lumban Tobing
  3. Pejagalan Steps Up Flood Defenses with Pump and Drainage Upgrades

    access_time14-11-2026 remove_red_eye552 personAnita Karyati
  4. Welcoming BTS's Concert in December 2026, Jakarta is Dressed in Purple

    access_time16-11-2026 remove_red_eye493 personFakhrizal Fakhri
  5. 32 School Basketball Teams to Compete in Teladan Cup 2026

    access_time15-11-2026 remove_red_eye403 personBudhi Firmansyah Surapati